DRAG DROP

DRAG DROP
You are tasked with creating a network that will accomplish the following requirements.
Requirements:
• The remote Sales Team must be able to connect to the corporate network.
• Each department must have ONLY two PCs and a server.
• Eqach department must be segmented from each other.
• The following VLANs have been designed:
VLAN 2 – Finance
VLAN 12 – Sales
VLAN 22 – Human Resources (HR)
Routing for VLAN 12 is implemented on the router. Routing for VLAN 2 and VLAN 22 is on the switch.
Instructions
Complete the network by dragging the required objects onto the diagram.
Objects can be used multiple times and not all placeholders need to be filled.
If at any time you would like to bring back the initial state of the simulation, please click the Reset All button.
Select and Place:

Exam N10-008: CompTIA Network+

Free dumps for N10-008 in PDF format.

High quality N10-008 PDF and software. VALID exam to help you pass.

comptia-exams

4 thoughts on “DRAG DROP

  1. This is so wrong…
    L3 switch should be where L2 Switch is shown because “Routing for VLAN 2 and VLAN 22 is on the switch”. Inter VLAN routing is handled by L3 switches.
    Router should be where L3 switch is shown because “Routing for VLAN 12 is implemented on the router” and the L2 switch should be where the Sales server is depicted. You need a switch here for obvious reason.
    Sales server should be on the Sales LAN below the PCs.

    2
    5
  2. Sales PC Sales Server HR Server
    | | HR PC
    Sales PC Sales VLAN 12 HR VLAN 22 |
    | | HR PC
    ? Layer 3 Switch___________ Ti ___________Router ________ Layer 2 Switch ___ HR VLAN 22______|
    | |
    ? Finance VLAN 2 ?
    | |
    | ?
    |
    Finance PC______Finance PC____________ ? __________ Finance Server