You have a c7000 enclosure with the three-phase input option and two BL460c Server Blades installed. How many power supplies must be installed for N+1 redundancy?
A. 2
B. 3
C. 4
D. 5
E. 6
You have a c7000 enclosure with the three-phase input option and two BL460c Server Blades installed. How many power supplies must be installed for N+1 redundancy?
A. 2
B. 3
C. 4
D. 5
E. 6