How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?

Refer to the exhibit.

How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
A. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.
B. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.
C. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
D. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.