How should the chassis discovery policy grouping be configured before the new chassis is discovered?

A customer has two Cisco UCS 6248 Fabric Interconnects in a cluster connected to one Cisco UCS 5108 Chassis via.
-2 ports from the primary fabric interconnect to chassis 1, I/O module A
-2 parts from secondary fabric interconnect to chassis 1, I/O module B
The customer wants to ensure maximum redundancy and bandwidth.
Within Cisco UCS Manager, how should the chassis discovery policy grouping be configured before the new chassis is discovered?
A. 4-link, none
B. 2-link, none
C. 2-link, port channel
D. 4-link, port channel

cisco-exams

5 thoughts on “How should the chassis discovery policy grouping be configured before the new chassis is discovered?

  1. The correct answer:

    A customer has two Cisco UCS 6248 Fabric Interconnects in a cluster connected to one Cisco UCS 5108 Chassis via

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.