Physical connectivity is implemented between the two Layer 2 switches, and the network connectivity between them must be configured 1.

Physical connectivity is implemented between the two Layer 2 switches, and the network connectivity between them must be configured 1. Configure an LACP EtherChannel and number it as 1; configure it between switches SW1 and SVV2 using interfaces Ethernet0/0 and Ethernet0/1 on both sides. The LACP mode must match on both ends 2 Configure the EtherChannel as a trunk link.
3. Configure the trunk link with 802.1 q tags.
4. Configure the native VLAN of the EtherChannel as VLAN 15.


A. See the Explanation below.

Pass Cisco CCNA 200-301 Exam in First Attempt

FULL Printable PDF and Software. VALID exam to help you pass.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.