What are the basic steps to add the second frame?

Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb F8 modules.
The customer wants to:
. add a second frame before they move into production
. have unified management
. have a separate logical enclosure for each frame
What are the basic steps to add the second frame? (Choose three.)
A. Move the standby composer to the second frame.
B. Disconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame.
C. Install a satellite module in the first frame.
D. Move the bottom VC module from the first frame to the second.
E. Move one of the uplinks from the FLM in the first frame to a FLM in the second.

Download Printable PDF. VALID exam to help you PASS.

One thought on “What are the basic steps to add the second frame?

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.