What is a typical output of the design planning phase that characterizes an existing data center?

What is a typical output of the design planning phase that characterizes an existing data center?
A. a high-level conceptual architecture proposal
B. a gap analysis
C. a verification plan
D. reactive fault detection and correction

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.