What is the most likely cause of the problem?

A systems administrator needs to add a VLAN to a network set to support a new application. They have added the network to the upstream switch and the Logical
Interconnect Group in HPE OneView but traffic is not passing. What is the most likely cause of the problem?
A. Intelligent Management Center (IMG) has not been updated via REST.
B. The administrator failed to update the state change message bus.
C. The administrator needs to update the Logical Interconnects from the Logical Interconnect Group.
D. The upstream switch doesn’t have the VLAN enabled.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.