What is the status of the switch?

Refer to the exhibit. After the power-on-self test (POST), the system LED of a Cisco 2950 switch turns amber. What is the status of the switch?

100-105-interconnecting-cisco-networking-devices-part-1_img_169

A. The POST was successful.
B. The switch has a problem with the internal power supply and needs an external power supply to be attached.
C. POST failed and there is a problem that prevents the operating system from being loaded.
D. The switch has experienced an internal problem but data can still be forwarded at a slower rate.
E. The switch passed POST, but all the switch ports are busy.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.