What must be added to the BOM at each site to build the solution?

Refer to the exhibit.

A customer is planning a new compute cluster. They require business continuity, and they need automatic transparent failover between sites with an RPO of 0. You propose HPE 3PAR 9450 arrays at each site. The displayed Bill of Materials (BOM) shows the hardware and software components for one site. What must be added to the BOM at each site to build the solution?
A. four additional HPE 3PAR 9000 4-port 16Gb Fiber Channel Host Bus Adapters
B. one HPE 3PAR All-inclusive Multi-system Software Suite
C. one HPE 3PAR Policy Manager Software license
D. two additional HPE 3PAR 9000 2-port 10Gb Ethernet Host Bus Adapters