What must the integrator do to perform this Synergy expansion?

A customer is expanding its Synergy environment from one rack with a 3-frame master/satellite configuration to five racks (15 Synergy Frames) with identical hardware configurations.
What must the integrator do to perform this Synergy expansion?

A. Create new Logical Enclosure (LE), Logical Enclosure Group (LIG), and Enclosure Group (EG) for each rack
B. Create a new Logical Enclosure (LE) for each rack using existing templates
C. Re-home the Logical Enclosure (LE) using the edited Enclosure Group (EG) and Logical Interconnect Group (LIG)
D. Perform hardware discovery from the console, and copy the Logical Enclosure (LE)

Download Printable PDF. VALID exam to help you PASS.

One thought on “What must the integrator do to perform this Synergy expansion?

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.