What should you do before you run the tool?

Your network contains an Active Directory domain named contoso.com. The domain contains two member servers named Server1 and Server2. All servers run Windows Server 2012 R2.
Server1 and Server2 have the Failover Clustering feature installed. The servers are configured as nodes in a failover cluster named Guster1. Cluster1 contains a file server role named FS1 and a generic service role named SVC1. Server1 is the preferred node for FS1. Server 2 is the preferred node for SVC1.
You plan to run a disk maintenance tool on the physical disk used by FS1.
You need to ensure that running the disk maintenance tool does not cause a failover to occur.
What should you do before you run the tool?
A. Run Suspend-ClusterResource.
B. Run Suspend-GusterNode.
C. Run cluster.exe and specify the pause parameter.
D. Run cluster.exe and specify the offline parameter.

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.