What should you do to better configure future systems?

After a new c7000 BladeSystem was deployed, you found that the power and cooling requirements were inadequate for the number of blades installed.
What should you do to better configure future systems?
A. Configure the Onboard Administrator for N+N power redundancy.
B. Run the HP BladeSystem Power Sizer to determine the power and cooling requirements.
C. Populate all the fans and power supplies possible for future enclosures.
D. Use three-phase power to ensure there will be enough power.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.