What will be the outcome of this setting in an active/active high availability configuration?

While creating a baseline tor the Gen9 blades in a new c7000 BladeSystem Enclosure in an active/active configuration, the integrator determines that one blade has an NIC teaming setting of fail over.
What will be the outcome of this setting in an active/active high availability configuration?
A. East/West bandwidth will be reduced few this server.
B. Network bandwidth will not be redundant for this server.
C. North/South bandwidth will be reduced for this server.
D. Downstream bandwidth will not be affected.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.