Which action ensures that fc2/10 is in an up state?


Refer to the exhibit. A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that fc2/10 is in an up state?
A. Replace the SFP port module in fc2/10.
B. Configure the admin port type E on the upstream switch that connects the port.
C. Enable NPIV on the upstream switch that connects the port.
D. Configure the BB_credit buffers on the upstream switch that connects the port.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.