Which action must be taken?

An engineer is implementing NPV mode on a Cisco MDS 9000 Series Switch.
Which action must be taken?
A. NPIV must be enabled on the upstream switch.
B. The FCNS database must be disabled in the fabric.
C. A port channel must be configured to the upstream switch.
D. All switches in the fabric must be Cisco MDS switches.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.