You enter the following command at the CLI of an HP E5406 zl Series switch with IP routing enabled:
Switch(config)# router rip
Switch(rip)#
Which additional step is necessary to enable RIP functionality?
A. Configure redistribution for all connected routes that must be advertised in RIP updates.
B. Configure a static route to the nearest RIP peer.
C. Enable RIP for every VLAN where the switch should send and receive RIP updates.
D. Disable all other dynamic routing protocols.