A multinational corporation needs to migrate servers, which are supporting a national defense project, to a new datacenter. The data in question-is approximately 20GB in size. The engineer on the project is considering datacenters in several countries as possible destinations. All sites in consideration are on a high-speed MPLS network (10Gb+ connections). Which of the following environmental constraints is MOST likely to rule out a possible site as an option?
A. Downtime impact
B. Legal restrictions
C. Peak time frames
D. Bandwidth