Which fact must you highlight in your survey that is required for a successful transition?

Refer to the exhibit.

Your customer is migrating their existing top-of-rack data center to a new location that uses an end-of-rack configuration. The customer requests a site survey prior to the migration. Which fact must you highlight in your survey that is required for a successful transition?
A. Power source must be 240 volts only for blade chassis.
B. Power source must be 240 volts only for fabric interconnect switches.
C. Blade chassis using passive TWINAX cables must be placed within 5 meters of the end rack.
D. Blade chassis must not be fully equipped with blades when using and end-of-rack setup.

cisco-exams

One thought on “Which fact must you highlight in your survey that is required for a successful transition?

  1. The good answer is C

    Twinax Copper Cables for the UCS 6324 Fabric Interconnect
    Twinax copper cables are available in various lengths for the UCS 6324 Fabric Interconnect. The 7 meter and 10 meter cables are active, which means that they contain active components with the SFP+ connector housing to improve signal quality. The ends of these cables have connectors that can plug directly into SFP receptacles.

    Table 7. Twinax Copper Cables
    Model

    Description

    SFP-H10GB-CU1M

    10-Gb Ethernet—copper SFP+ (1 m, 3.28 ft.)

    SFP-H10GB-CU3M

    10-Gb Ethernet—copper SFP+ (3 m, 9.84 ft.)

    SFP-H10GB-CU5M

    10-Gb Ethernet—copper SFP+ (5 m, 16.4 ft.)

    SFP-H10GB-ACU7M

    10-Gb Ethernet—copper SFP+ (7 m, 22.9 ft.)

    SFP-H10GB-ACU10M

    10-Gb Ethernet—copper SFP+ (10 m, 32.8 ft.)

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.