Which five actions should you perform in sequence?

DRAG DROP
You manage a database named DB1 that uses the following filegroups:

The database is configured to use full recovery model. Transaction logs are backed up to a backup set named TLogBackup.
The PRIMARY and FG2 for DB1 are damaged. FG1 and FG3 are intact.
You need to design a piecemeal restore plan that meets all the above requirements. You need to bring critical filegroups online as soon as possible while minimizing restoration time. All damaged filegroups must be online after the restore operation completes.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.