Which four actions should you perform in sequence?

DRAG DROP
You create a solution within a Microsoft Power Platform environment. The environment includes all connections required for the solution.
You need to create a connection reference for the flows.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the order.
Select and Place:

microsoft-exams

One thought on “Which four actions should you perform in sequence?

  1. 1. Within the solution, select New and then connection references
    2. Assign an existing connection to connection references
    3. Use the connection references in the relevant cloud flows in solution
    4. Assign the connection references to relevant

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.