Which of the following procedures are required to accomplish this task?

It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit. Which of the following procedures are required to accomplish this task? (Choose three.)
A. configure static frame relay map entries for each subinterface network.
B. remove the ip address from the physical interface
C. create the virtual interfaces with the interface command
D. configure each subinterface with its own IP address
E. disable split horizon to prevent routing loops between the subinterface networks
F. encapsulate the physical interface with multipoint PPP

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.