Which of the following steps would MOST likely correct this issue?

A UTM is deployed on the external edge of the main corporate office. The office connects to the WAN port of the edge router. The edge router at the main office connects to the remote offices using GRE IPSec tunnels. A network administrator notices that a worm that was not detected by the UTM has spread from the remote sites into the corporate network. The UTM currently has traffic rules applied that should block the port used by the worm. Which of the following steps would MOST likely correct this issue?
A. Move the UTM onto the LAN side of the network
B. Enable TLS inspection on the UTM
C. Enable stateful inspection on the UTM
D. Configure the UTM to deny encrypted files from being transferred

Exam N10-008: CompTIA Network+

Free dumps for N10-008 in PDF format.

High quality N10-008 PDF and software. VALID exam to help you pass.

comptia-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.