Which option is correct when using Virtual Switching System to combine two physical switches into one logical switch?

Which option is correct when using Virtual Switching System to combine two physical switches into one logical switch?
A. Both control planes forward traffic simultaneously.
B. Only one control plane is active, while the other control plane is in standby.
C. Only one data plane forwards traffic, while the other data plane is in standby.
D. Control planes are combined into one virtual control plane.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.