Which option is correct when using VSS to combine two physical switches into one logical switch?

Which option is correct when using VSS to combine two physical switches into one logical switch?
A. Both data planes forward traffic simultaneously.
B. Only one data plane forwards traffic, while the other data plane is on standby.
C. Both control planes forward traffic simultaneously.
D. Control planes are combined into one virtual control plane.

cisco-exams

2 thoughts on “Which option is correct when using VSS to combine two physical switches into one logical switch?

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.