DRAG DROP
You need to help an organization progress through each level of the Microsoft SAM Optimization Model (SOM).
In which order should you progress through the levels? To answer, drag the maturity levels to the correct project phases. Each maturity level may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place: