In which phase of cisco design life cycle the validation of network infrastructure happened?
A. Assessment in plan
B. Deployment in build
C. Validation in build
D. Optimization in operat
In which phase of cisco design life cycle the validation of network infrastructure happened?
A. Assessment in plan
B. Deployment in build
C. Validation in build
D. Optimization in operat
correct answer is A Plan phase, as the validation is of existing infrastructure and not the new design. see page 10 of the official guide
Official Cert Guide ( 200-310) , page 11 ,
Build phase , Validation process .
C . is correct
correction: A. Assessment in plan
According to CiscoPress 200-310 Official Cert Guide 5th Edition the answer is C. In the Assessment stage of the Plane phase
…The network assessment helps determine the network infrastructure’s compliance against industry and Cisco’s best practices and corporate policies. The assessment also determines gaps in the network operation team’s ability to support the new technologies being introduced. The Design process creates a resilient and scalable network design that can support the business requirements.
Build Phase…
Maybe Cisco considered other answer in the test. But the explanation is clear.
PPDIOO it’s obsolete, the new (and simplified) lifecycle approach is PBM, (Plan, Build, Manage)
C is the correct.
See the graph in the following link.
https://blogs.cisco.com/datacenter/achieving-data-center-agility
😉
It’s actually the design phase.
http://www.ciscozine.com/the-ppdioo-network-lifecycle/