Which planning and configuration guideline has to be adhered to so this StoreOnce B6200 Backup System works as desired?

Your customer has been working with a member of your technical team to size a new HP StoreOnce Backup System in an HP Data Protetor 7 environment. The engineer is out of the office but provides you with the report that they generated from the HP Storage Sizing Tool.


Which planning and configuration guideline has to be adhered to so this StoreOnce B6200 Backup System works as desired?
A. A catalyst license is configured per node.
B. Source Side Deduplication in Data Protector is disabled.
C. The usage of VTLs and shares is avoided.
D. An adequate number of streams are configured.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.