An Administrator is replacing a fabric interconnect. The failed fabric interconnect was Fl-A and was master at same time of failure. Which process bring the replacement fabric interconnect into the cluster?
A. Connect the new Fl-A to the management network and the Layer 1/Layer2 links to the existing FI-B Let the system sync with Fl-B when prompted at the console.
B. Connect the new Fl-A to the management network only. Use the full state backup file to restore the configuration through Cisco UCS Manager GUI. Connect The Layer 1/Layer 2 cables.
C. Connect the Fl-A to the management network and the Layer 1/Layer2 links to the existing Fl-B. Use the all configuration backup file to restore the configuration through the Cisco UCS Manager GUI.
D. Connect the new Fl-A to the management network and the Layer 1/Layer2 links to the existing Fl-B. Use the full state backup file to restore the configuration when prompted at the console.
E. Connect new Fl-A to Fl-B using the Layerl/Layer 2 cables only. Sync the configuration when prompted. Connect the management interface when the configuration is synced.
I prefer E. Connect management interface after the sync makes more sense to me.
But according to the documentation, you are right. We need to answer A.
You’re right, it’s A
https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/hw/6200-install-guide/6200_HIG/6200_HIG_chapter_010.html#task_3DEE03FA10DC41A68FBB458567849184
I think the correct answer A