Which solution meets the company requirements?

Scenario:
A company has been using a Fibre Channel infrastructure for the last three years. The company is located in a nine-story building but is currently occupying eight floors. Each of the nine floors has its own Brocade 8 Gb SAN Switch with Fibre Channel, which has a license for eight ports. Each department hosts a single Windows 2008 terminal server host for connection to their storage and data applications on the SAN, which is in the data center on the first floor. Each Brocade 8/8 switch is connected to the floor above and below by a single fibre connection.
Refer to the Scenario:
The company has requested a low-cost proposal to improve high availability so that a switch failure on any floor will not affect the rest of the building.
Which solution meets the company requirements?
A. Convert to a mesh topology.
B. Add additional HBA to each terminal server.
C. Convert to a ring topology.
D. Add an addtional ISL between each switch.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.