Which step is required during pre-installation of the IX5000?

Which step is required during pre-installation of the IX5000?
A. Hang celling lights.
B. Install wall panels.
C. Verify that the room floor is level.
D. Verify that appropriate licenses, upgrades, and tools are available.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.