A customer with a 3-frame Synergy composable infrastructure has received a second rack to expand existing composable infrastructure resource pools. The integrator has cabled the management ring as shown. Which steps should the integrator take to increase availability of this configuration (Choose two.)
A. Move on Composer to Rack 2
B. Move both Composers to Rack 2
C. Enable multi-rack high availability in HPE OneView
D. Move both management uplinks to Rack 2
E. Move one management uplink to Rack 2
A, E