Which switch is now the master?

Two switches are members in an active Intelligent Resilient Framework (IRF) virtual device. A network administrator joins a third switch to the IRF virtual device. Which switch is now the master?
A. The current master of the IRF virtual device always remains the master.
B. The switch with the lowest member ID always becomes the master.
C. The switch with the lowest priority value always becomes the master.
D. The switch with the highest priority value always becomes the master.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.