Which three actions should you perform?

A company implements Dynamics 365 for Finance and Operations.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements: Locate a supermarket at the subcontractor building.
Support picking and shipping activity tracking.
Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A. Modify the tumble polish activity and assign it to subcontractor
B. Create transfer activities and assign them to the subcontractor
C. Create a resource and work cell resource group for the subcontractor
D. Create a new production flow version
E. Modify the tumble polish operation and associate it with the subcontractor

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.