Which three actions should you perform?

You are the lead product design engineer at a plastics manufacturing company. You implement a new process that uses a single tool to produce three finished goods at the same time.
You need to set up the planning item number and formula to correctly to manufacture the three items.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A. Create item number for planning item and the associated formula
B. Add minimum and maximum quantities on formula
C. Add a coverage group to the formula
D. Assign co-products to the formula
E. Specify each of the finished good items as co-products

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.