Which three actions should you perform in sequence?

You are developing a SQL Server PowerPivot model to monitor the rate of production of defective products.
The PowerPivot model contains many tables. The FactProduction table is configured as shown in the following diagram.


The model requires a key performance indicator (KPI) named Defective Units to measure the rate of production of defective units. The rate of production of defective units is calculated by dividing the sum of the Defects column by the sum of the Units column.
The KPI has the following requirements.
. If the rate of production of defective products equals or exceeds 5% then the KPI must report a status of off target (red).
. If the rate of production of defective products is less than 5% and equals or exceeds 2% then the KPI must report a status of slightly off target (yellow).
. If the rate of production of defective products less than 2% then the KPI must report a status of on target (green).
You need to develop the KPI to meet the requirements.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Select and Place:


microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.