Which three actions should you perform in sequence?

DRAG DROP
You have an Exchange Server 2016 organization. The organization contains two Mailbox servers.
You have a database that is replicated to both servers. The database contains 500 mailboxes. You add new volumes to the Mailbox servers.
You need to move all of the mailbox data to the new volumes. The solution must meet the following requirements: Ensure that multiple copies of the mailbox data are available at all times. Minimize downtime for the mailbox users.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

microsoft-exams

One thought on “Which three actions should you perform in sequence?

  1. The solution must meet the following requirements: Ensure that multiple copies of the mailbox data are available at all times.

    1- Create a new database
    2- Mount the new database
    3- Create replicated database copies

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.