Which three domain operations master roles should you transfer?

You are decommissioning one of the domain controllers in a child domain.
You need to transfer all domain operations master roles within the child domain to a newly installed domain controller in the same child domain.
Which three domain operations master roles should you transfer? (Each correct answer presents part of the solution. Choose three.)
A. RID master
B. PDC emulator
C. Schema master
D. Infrastructure master
E. Domain naming master

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.