An administrator wants to ensure that any virtual machine added to a certain port group always has sufficient network resources. Network I/O Control version 3 has been enabled on the Distributed Switch. Which three steps will achieve this objective? (Choose three.)
A. Reserve bandwidth for virtual machine system traffic on the Distributed Switch Port Group.
B. Edit the virtual machine’s Resource settings and set a reservation for virtual machine system traffic.
C. Create a Network Resource Pool on the Distributed Switch and set a reservation quota.
D. Reserve bandwidth for virtual machine system traffic on the Distributed Switch.
E. Add the Network Resource Pool on the Distributed Switch Port Group.