Home » Microsoft » MB6-703 » Which three types of information should you identify?
You need to identify which type of information you can obtain by performing bill of materials (BOM) calculations?
Which three types of information should you identify? Each correct answer presents part of the solution.
A. The projected sales prices and costs of BOM Items manufactured in different quantities
B. The quantity of raw materials required to manufacture the BOM item
C. The projected sales quantity of the BOM item
D. The profit margins and contribution ratios
E. The maximum production run size for the BOM
Correct Answer: ACD
Explanation/Reference:
* The BOM calculation is performed on the whole BOM structure and for the specified quantity. You can specify how the cost and sales prices should be calculated for each component. You can also change the quantity of the series used in the subBOM.
* BOM calculations determine the cost-price and sales prices for the BOM depending on profit settings. BOM calculations determine the estimated BOM prices on all BOM levels. The contribution of a single item or operation to the price of the BOM level can be determined. The contribution of all items and operations on a specific level can also be determined.
* The Calculation form is used to calculate a manufactured item’s cost and to generate an associated item cost record within a costing version. The Calculation form can also be used to calculate a manufactured item’s sales price and to generate an associated item sales price record within a costing version.