Which two actions must be done to the frame to accomplish this task?

An FCoE frame has just arrived on a Cisco Nexus 5000 Series Switch and must be switched toward a directly-attached FCoE storage array. Which two actions must be done to the frame to accomplish this task? (Choose two.)
A. The frame is switched out of a physical Fibre Channel interface.
B. The frame is switched out of a physical Ethernet interface.
C. The frame is switched out of a logical Ethernet interface.
D. The frame is switched out of a logical Fibre Channel interface.
E. The frame encapsulates a UDP/IP packet.
F. The frame encapsulates a TCP/IP packet.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.