Which two actions should be performed to bring the system back to operational state and to prevent future occurrences?

Refer to the exhibit.

A customer reports that after a network failure, all of the Cisco Jabber clients are not switched back to their home nodes. An engineer determines that the primary Cisco IM&P server is in Failed Over state. Which two actions should be performed to bring the system back to operational state and to prevent future occurrences? (Choose two.)
A. Advise all users to re-login to their Jabber clients.
B. Confirm that both IM&P servers are configured in the Presence Redundancy Group configuration pane.
C. Perform a restart of the IM&P primary server to force fallback.
D. Click the Fallback button in the Server Action pane.
E. Set the Automatic Failover parameter in the Server Recovery Manager Service Parameters to the value True.

cisco-exams

One thought on “Which two actions should be performed to bring the system back to operational state and to prevent future occurrences?

  1. D and E is correct

    D – bring it back in normal state
    E – prevent for the future

    //B is incorrect, you can see the config of the presence redundancy group on the picture

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.