Which two actions should you perform?

You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.
Your client has added new capabilities to a product in development, which necessitates a major change to existing test cases. The product owner has created a new product backlog item (PBI) and has provided you a link to a document that explains these new requirements.
You need to provide easy access to the requirements document from the test cases.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. From the Test Suite window, add the requirement document by using Add Requirements.
B. From the Links tab, link the requirements document to the PBI.
C. From the Test Plan Manager, add a link to the PBI.
D. For each test case, use the Tested Backlog Items tab to add a link to the PBI.