Which two command sequences must be configured on a switch to establish a Layer 3 EtherChannel with an open-standard protocol?

Which two command sequences must be configured on a switch to establish a Layer 3 EtherChannel with an open-standard protocol? (Choose two.)
A. interface GigabitEthernet0/0/1 channel-group 10 mode auto
B. interface GigabitEthernet0/0/1 channel-group 10 mode on
C. interface port-channel 10 no switchport ip address 172.16.0.1 255.255.255.0
D. interface GigabitEthernet0/0/1 channel-group 10 mode active
E. interface port-channel 10 switchport switchport mode trunk

Pass Cisco CCNA 200-301 Exam in First Attempt

FULL Printable PDF and Software. VALID exam to help you pass.

cisco-exams

2 thoughts on “Which two command sequences must be configured on a switch to establish a Layer 3 EtherChannel with an open-standard protocol?

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.