Which two criteria must be considered when conducting an outdoor bridge site survey?

Which two criteria must be considered when conducting an outdoor bridge site survey? (Choose two.)
A. near-far effect
B. weather
C. traffic lights
D. power lines
E. Fresnel zone

cisco-exams

2 thoughts on “Which two criteria must be considered when conducting an outdoor bridge site survey?

  1. Typically the answer should be B (weather influences absorption and scattering) and E as no more than 40% of the zone should be obscured

    4
    1

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.