A post-deployment active wireless site survey was just completed for a company. Which two pieces of information must be included in the site survey report?
(Choose two.)
A. client performance metrics obtained during the survey
B. heat maps from the data that was captured
C. floor plans for Cisco Prime Infrastructure
D. existing WLC configurations
E. RRM recommendations for the WLC
Yup! This should be AB.
Yes, it should be AB
Answer should be AB