Which wo cabling methods reflect the minimum configuration needed for full synchronization between the two cisco ASR 9000 chassis.?

A service provider is implementing an nV Edge system with two Cisco ASR 9000 chassis. Each chassis has two RSPs. Which wo cabling methods reflect the minimum configuration needed for full synchronization between the two cisco ASR 9000 chassis.? (Choose Two)
A. Create the single virtual control plane that connect the two RSPs between the two chassis via Layer 2 connections.
B. Create the IRL connections between the two Chassis via Layer 3 connections using the ports of the line cards.
C. Create the IRL connections between the two chassis via Layer 3 connections using the EOBS 10 Gpbs ports of the RSPs.
D. Create the single virtual control plane that connect the two chassis via 100 Gpbs bundle interfaces.
E. Create the IRL connections between the two chassis via Layer 1 connections using the EOBC 10 Gpbs ports of the RSPs.
F. Create the single virtual control plane that connect the two chassis via layer 3 connections using the 10 Gbps ports of the line cards.
G. Create the IRL connections between the two chassis via layer 1 connections using the 10 Gpbs ports of the line cards.

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.