An administrator receives an alert on a PowerStore Cluster with three appliances:
The appliance A1 is projected to run out of space in 8 days Capacity utilization is above 90 percent Which tools are available to assist the Administrator with a potential resolution?
A. Thin provision conversion wizard
B. System Optimization
C. Space reclamation wizard
D. Assisted Migration
right answe3r
D. Assisted Migration
D – Assisted Migration
D is correct