How can you create reservations for the material based on scheduled demand for a Complex Maintenance Repair and Overhaul (CMRO) work order when the material does not exist in the on-hand inventory?

How can you create reservations for the material based on scheduled demand for a Complex Maintenance Repair and Overhaul (CMRO) work order when the material does not exist in the on-hand inventory?
A. CMRO work orders are not eligible for reservations.
B. CMRO requires inventory on hand to support reservation.
C. CMRO creates reservation against a purchase order or any other supply source.
D. CMRO creates a WIP job to make the material before you can create the reservation.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.