How do you determine the remaining resource capacity before adding additional SolutionPacks?

You deployed ViPR SRM at a site then added and configured some SolutionPacks. How do you determine the remaining resource capacity before adding additional SolutionPacks?
A. Use the Planner tool to evaluate the load distribution
B. Look at the logs of currently installed SolutionPacks to evaluate level of resource usage
C. Use operation system tools and the provided Evaluation tool to evaluate resource usage
D. Use Watch4net Health reports to evaluate resource usage

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.